samcfc Posted August 19, 2010 Report Share Posted August 19, 2010 hi everyone when i use tubing i want to continue using my stik clips so i can change rigs quickly. would the best thing to do is to tie a swivel to my mainline then thread the run rig rubber over the swivel, put a stik clip on the swivel, then clip my rigs on??? any advice would be much appreciated cheers sam Quote Link to comment Share on other sites More sharing options...
beanz Posted August 19, 2010 Report Share Posted August 19, 2010 do you mean youve already put the run rig rubber(buffer bead) on the main line ??? from scratch it should go ...lead, bead then swivel/quick clip......then its just a case of adding the hook link......unless you want a flying back lead,if its not a quick change back lead then add that 1st other wise it can be attached or taken off any time without breaking it all down Quote Link to comment Share on other sites More sharing options...
samcfc Posted August 19, 2010 Author Report Share Posted August 19, 2010 do you mean youve already put the run rig rubber(buffer bead) on the main line ??? from scratch it should go ...lead, bead then swivel/quick clip......then its just a case of adding the hook link......unless you want a flying back lead,if its not a quick change back lead then add that 1st other wise it can be attached or taken off any time without breaking it all down thanks for that, thats what i thought was right cheers Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.