Jump to content

quick change systems


samcfc

Recommended Posts

hi everyone when i use tubing i want to continue using my stik clips so i can change rigs quickly.

 

would the best thing to do is to tie a swivel to my mainline then thread the run rig rubber over the swivel, put a stik clip on the swivel, then clip my rigs on???

 

any advice would be much appreciated

 

cheers sam

Link to comment
Share on other sites

do you mean youve already put the run rig rubber(buffer bead) on the main line ???

 

 

from scratch it should go ...lead, bead then swivel/quick clip......then its just a case of adding the hook link......unless you want a flying back lead,if its not a quick change back lead then add that 1st other wise it can be attached or taken off any time without breaking it all down

Link to comment
Share on other sites

do you mean youve already put the run rig rubber(buffer bead) on the main line ???

 

 

from scratch it should go ...lead, bead then swivel/quick clip......then its just a case of adding the hook link......unless you want a flying back lead,if its not a quick change back lead then add that 1st other wise it can be attached or taken off any time without breaking it all down

 

thanks for that, thats what i thought was right

cheers

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...